1989-Montero · meters gauges · страница 11 из 16 · Открыть оригинал PDF ↗

OIL PRESSURE GAUGE UNIT CURRENT CHECKHIm
(1) Disconnect the wiring connector from the oil pressure
gauge unit inside the engine compartment.
(2) Apply battery voltage (through the test light) to the gauge
unit side terminal.
(3) Check to be sure that the test light switches OFF when
the engine is stopped, and that it flashes while the
engine is running.

VOLTAGE METER SIMPLE TEST
NoN5Gc
(I) Connect a voltmeter for testing.
(2) Turn the ignition key to the ON position.
(3) Compare the readings of the voltmeter for testing and of
the vehicle’s voltage meter.
Standard value:
1ov f0.5V
16V f0.5V
COMBINATION METER REMOVAL AND INSTALLATlON



Removal steps
1. Meter cover
l 4 2. Connection of speedometer cable
3. Meter assembly
NOTE
(1) Reverse the removal procedures to reinstall.
(2) I)* : Refer to “Service Points of Installation”.
Проверка
REED SWITCH
Using an ohmmeter, check that continuity and discontinuity
alternate between terminals 1 and 2 four times at every
rotation of the shaft of the speedometer cable connection.


I
