1998 · INTAKE AND EXHAUST [15] · страница 5 из 5 · Открыть оригинал PDF ↗
Текст распознан со скана. Числа и обозначения можно сверить с оригиналом ниже.

INSTALLATION SERVICE POINTS
~A =INTAKE MANIFOLD GASKET INSTALLATION
Install the gaskets so that the projections face in the directions
shown in the illustration:
INTAKE MANIFOLD INSTALLATION
Tighten the intake manifold mounting nuts one bank after the
other by the following procedure
Tighten the nuts in the right bank to 7 Nm:
Tighten the nuts in the left bank to 20 to 23 Nm:
Tighten the nuts in the right bank to 20 to 23 Nm
Repeat steps (2) and (3) again in the same order
HIGH-PRESSURE FUEL HOSE INSTALLATION
Apply a drop of new engine oil to the O-ring:
Caution
Be sure not to let engine oil in the delivery pipe:
2While turning the high-pressure fuel hose to the right and
left, install the delivery pipe; while being careful not to
damage the O-ring
If it does not turn smoothly, the O-ring may be trapped
remove the high-pressure fuel hose and then re-insert it
into the delivery pipe and check once again
Tighten the high-pressure fuel hose to the specified
torque
Tightening torque: 5 Nm
Проверка
Check the following points; replace the part ifproblem is
found:
(2} Diogging%r crachegadvarpressure (vacuum) outlet port; orDamage or cracking of any part:
clogging of the water or gas passages:
