FSNAP RING INSTALLATION · 5 — Pajero II 1991–1998 — руководство по ремонту

FSNAP RING INSTALLATION · 5

FSNAP RING INSTALLATION · 5

Service Bulletins · MSB98E27001e · страница 5 из 5 · Открыть оригинал PDF ↗

Иллюстрация 1, страница 5

FSNAP RING INSTALLATION

(1) After installing the snap ring, measure the clearance (A)
between the snap ring and the retainer with a thickness gauge,
and check that it is within the standard values.

Standard value (A): 0-0.166 mm

(2) If the clearance exceeds the standard value, change the snap
ring so that the clearance is at the standard value.

Thickness of snap ring mmIdentification colour
2.17
2.01Yellow
1.85Blue
1.69Purple
1.53Red
Таблица в оригиналеТаблица: оригинал страницы 5
Иллюстрация 2, страница 5

GROTOR INSTALLATION

Using the special tool, install the rotor until the standard
dimension between the rotor and the bearing case is obtained.

Standard value (A): 19.4-20.0 mm