1987 · Карданные валы и шарниры — страница 6

DISASSEMBLY AND REASSEMBLY · 6

1987-Montero · prop shaft UV joints a · страница 6 из 8 · Открыть оригинал PDF ↗

Иллюстрация 1, страница 6

(2) With the mating marks in alignment, install the propel-
ler shaft to the companion flange.

Caution

Degrease the thread of the mounting bolts and nuts
before tightening these parts. Otherwise, they could
become loose.

Иллюстрация 2, страница 6
Иллюстрация 3, страница 6

DISASSEMBLY AND REASSEMBLY

NlGGE-

Иллюстрация 4, страница 6
Иллюстрация 5, страница 6

l + Adjustment of journal end play
4* 1. Snap ring
l + 2. Grease nipple

+w l + 3. Journal bearing
l + 4. Journal

NOTE
(1) Reverse the disassembly procedures to reassemble
(2) +e : Refer to “Service Points of Disassembly”.
(3) ~~ : Refer to “Service Points of Reassembly”.

5. Flange yoke

6. Sleeve yoke

SERVICE POINTS OF DISASSEMBLY 1. REMOVAL OF SNAP RING

N16GFAC

(1) Make mating marks on the yokes of the universal joint
that is to be disassembled.

(2) Remove the snap rings from the yoke with snap ring
pliers.

Caution

When disassembling, note the positions of snap
rings so that they may be reinstalled in the same
positions.

3. REMOVAL OF JOURNAL BEARING

(1) Remove the journal bearing from the propeller shaft
yoke with special tool.

Иллюстрация 6, страница 6
Иллюстрация 7, страница 6
Иллюстрация 8, страница 6
Иллюстрация 9, страница 6
Оригинальная страница руководства
16-6 PROPELLER SHAFT AND UNIVERSAL JOINTS - Propeller Shaft
100%

Назад
Сверху