1991-Montero-Service-Manual · ac compressor servicing · страница 20 из 25 · Открыть оригинал PDF ↗
electrical leads from field coil. Remove 3 field coil mounting bolts.
Remove field coil.
Проверка
Check friction surfaces for damage from excessive heat or
grooving caused by slippage. Replace parts as necessary. Check coil
winding for shorted or open winding. Clean surfaces with solvent and
dry rag.
Installation
To install, reverse removal procedure. Tighten field coil
retaining screws to 30-56 INCH lbs. (3.4-6.4 N.m). Ensure pulley-to-
armature gap is .016-.024" (.4-.6 mm). If gap is not as specified,
adjust by adding or removing shims. Tighten center bolt to
96-108 INCH lbs. (11-13 N.m). See Fig. 15.



















Fig. 15: Exploded View of Rotary Vane Compressor (Panasonic)
Courtesy of Chrysler Motors.
