Pajero II Workshop Manual 1998 Supplement · Кузов · страница 8 из 13 · Открыть оригинал PDF ↗
Текст распознан со скана. Числа и обозначения можно сверить с оригиналом ниже.
POWER WINDOW OPERATION CURRENT INSPECTION
Remove the power window fuse and connecta circuit
analyser as shown in the illustration_
2When the power window switch is pressed to the UP
position,large amount of current tlows at the time the
window starts to close and when it is fully closed,SO
measure the operation current in the interval between
these two points:
Standard value:
A (for 1415V power supply voltage at
258C)
If the operation current is outside the standard value, refer
to "Troubleshooting" (P.42-2).
CirCUIT BREAKER (INCORPORATED IN THE POWER WINDOW MOTOR) INSPECTION
Press the power window switch to the UP position tofully
close the window glass, and keep pressing the switch for
a further 10 seconds_
2Release the power window switch from the UP position
and immediately press it to the DOWN position. The
condition of the circuit breaker is good if the power
window glass starts tomove downwards within 60
seconds.
