1989-Montero · fuel system · страница 45 из 53 · Открыть оригинал PDF ↗
CUT SOLENOID
25. INSTALLATION OF SLOW CUT
VALVE/;ZO.FEEDBACK SOLENOlD VALVE

INSPECTION AND ADJUSTMENT AFTER ASSEM- BLY NI4r.ll*ab
FAST IDLE OPENING
(1) Set lever on the second highest cam of the fast idle cam.
(2) Measure the primary valve to throttle bore clearance.
Standard value : 0.80 mm (.031 in.)
(3) If the clearance is out of specification, adjust using the
fast idle adjusting screw for the standard value.
NOTE
Adjusting screw direction of rotation vs. idle rpm
| 1 Adjusting screw | 1 Valve opening | 1 Fast idle rpm |
|---|---|---|
| Clockwise | Larger | Increases I |
| Counter clockwise | Smaller | Decreases I |

N14MIB.4
UNLOADER OPENING


