Проверка · 27

INSPECTION · 27

1989-Montero · emission system · страница 27 из 38 · Открыть оригинал PDF ↗

Проверка

(1) Referring to the VACUUM HOSES ROUTING. confirmy
the vacuum hoses are properly connected.
(2) Check the hoses for irregularities (disconnection, loo-
seness, etc.) and confirm that there is no breakage or
damage.

INSTALLATION

NZSJDAU

(1) When connecting a hose, firmly press if onto the nipple.
(2) Referring to the VACUUM HOSES ROUTING, connect the
hoses correctly.

CRANKCASE EMISSION CONTROL SYSTEM COMPONENTS LOCATION

Nz5!A-I3

Иллюстрация 1, страница 27
Иллюстрация 2, страница 27
Иллюстрация 3, страница 27
Иллюстрация 4, страница 27
Иллюстрация 5, страница 27
Иллюстрация 6, страница 27

POSITIVE CRANKCASE VENTILATION (PCW VALVE

For information concerning the checking of the positive
crankcase ventilation valve, refer to GROUP 0 - Maintenance
Service.

REMOVAL

(1) Remove the air intake plenum. (Refer to GROUP 11 - Air
Intake Plenum.)
(2) Remove the positive crankcase ventilation valve.

INSTALLATION

(I) Install the positive crankcase ventilation valve and tighten
to specified torque.

Specified tightening torque : 8-12 Nm (6-g ft.lbs.)

(2) Install the air intake plenum. (Refer to GROUP 11 - Air
Intake Plenum.)

Оригинальная страница руководства
EMISSION CONTROL SYSTEM <3.OL ENGINE> - %%,?“i%%$%: 25-27
100%

Назад
Сверху