MANUALS · INTAKE AND EXHAUST [15] · страница 4 из 30 · Открыть оригинал PDF ↗
Текст распознан со скана. Числа и обозначения можно сверить с оригиналом ниже.

INTAKE MANIFOLD VACUUM INSPECTIONEISFBAB
Refer to GROUP 11Service Adjustment Procedures:
SUPERCHARGING PRESSURE CONTROL SYS-
TEM INSPECTION < Vehicles with supercharging
pressure relief solenoid valve>>
(1) Remove the vacuum hose (yellow) from the supercharging
pressure relief solenoid valve and plug the hose.
(2) Connect a hand vacuum pump to the supercharging pres-
sure relief solenoid valve.
(3) Check the vacuum condition:
Распознанный текст таблицы — требует сверки с оригиналом
| Engine condition | Normal condition |
|---|---|
| Idling | 0 mmHg |
| 2,000 (/min | 300 mmHg (12 inHg) or more |
SUPERCHARGING PRESSURE RELIEF SOLENOID VALVE INSPECTION < Vehicles with supercharging pressure relief solenoid valve>
OPERATION INSPECTION
(1) Connecthandvacuumpumptothesolenoidvalve
nipple(see the illustration to the left):
(2) Usingjumper wire, connect between the solenoid valve
terminal and battery terminal.

(3) Connecting and disconnecting the jumper wire at the battery
negativeterminaltoapplynegativvepressurecheck
tightness
Распознанный текст таблицы — требует сверки с оригиналом
| Jumper wire | nipple condition | Normal condition |
|---|---|---|
| Connected | Open | Negative pressure leaks |
| Close | Negative pressure is held. | |
| Disconnected | Open | Negative pressure is held, |
COIL RESISTANCE INSPECTION
Measure resistance between solenoid valve terminals:
Standard value: 3644 n [at 20*€ (68PF)]

Mitsubishi Motors CorporationDec1993


