Service Adjustment Procedures
VARIABLEINDUCTION CONTROL SOLENOIDVALVE INSPECTION
OPERATION CHECK

(1)Usehand vacuum pump to apply vacuum to the vacuum
tank (white vacuum hose connected) side nipple.
(2) Check air-tightness by applving voltage to the solenoid valve
terminals.
Распознанный текст таблицы — требует сверки с оригиналом
| Battery voltage | The other nipple of the valve | Normal condition |
|---|---|---|
| Applied | Open | Vacuum leaks |
| Close with a finger | Vacuum maintained | |
| Not applied | Open | Vacuum maintained |
COIL CONTINUITY CHECK
Use an ohmmeter to measure the resistance_
Standard value: 36-44 0 (at 20PC)