Service Bulletins · MSB98E37002e · страница 6 из 12 · Открыть оригинал PDF ↗




SERVICE POINTS OF DISASSEMBLY
2. REMOVAL OF PITMAN ARM
4. REMOVAL OF SIDE COVER AND CROSS-SHAFT ASSEMBLY
With the mainshaft and cross-shaft placed in the straight ahead
position, tap the bottom of the cross-shaft with a plastic hammer to
take out the cross-shaft together with the side cover.
10. REMOVAL OF Y-PACKING
Do not remove the Y-packing at the rear of the needle bearing
unless there is fluid leakage from the threads of the adjusting bolt.
If there is leakage, replace the Y-pacing with a new one.
<Deleted>
13. REMOVAL OF RACK PISTON
Remove the rack piston form the mainshaft by turning it
counterclockwise.
Caution
Be careful not to lose the 26 balls inside the rack piston.


When removing the main shaft, remove it while pressing the
bearing race so that the balls do not come out.
