1989-Mitsu-Factory Manual · mpi system · страница 38 из 48 · Открыть оригинал PDF ↗
Проверка
N,-
INJECTORS
(1) Measure resistance between terminals of injector using a
circuit tester.
Standard value : 13-16 0, at 20°C (68°F)
(2) If the resistance is out of specification, replace the
injector.
SERVKE POINTS OF INSTALLATION 13./12. INSTALLATION OF INSULATOR
NWSDAG
(1) Attach a new six injector purpose insulator to the
intake manifold.
(2) Attach a new four delivery pipe,purpose insulator to
the intake manifold.

11./10./9. INSTALLATION OF GROMMET, O-RING AND INJECTOR
(1) Install a new grommet and O-ring to the injector. Apply
a coating of spindle oil or gasoline to the O-ring of the
injector.


If it does not turn smoothly, the O-ring may be
jammed; remove the injector, check O-ring and then
re-insert it into the delivery pipe and check once again.
8. INSTALLATION OF DELIVERY PIPE
Attach the delivery pipe.
At this time, confirm that the insulator is properly inserted
into the pipe mounting hole.



