SERVICE ADJUSTMENT PROCEDURES · 26

SERVICE ADJUSTMENT PROCEDURES · 26

MANUALS · EMISSION CONTROL [17] · страница 26 из 46 · Открыть оригинал PDF ↗

Текст распознан со скана. Числа и обозначения можно сверить с оригиналом ниже.

CRANKCASE EMISSION CONTROL SYSTEM <4G64 Engine>

Иллюстрация 1, страница 26

GEM12O

POSITIVE CRANKCASE VENTILATION SYSTEM System Inspection

(1) Disconnect the ventilation hose from the positive crank-
case ventilation valveThen, remove the positive crank-
case ventilation valve from the rocker cover and reconnect
it to the ventilationhose

Иллюстрация 2, страница 26

(2) Idle the engine and put a finger to the open end of positive
crankcaseventilationvalvetomakesurethatintake
manifoldvacuum is felton thefinger.
NOTE

At this time, the plunger inside the positive crankcase
ventilation valvemovesback and forth;

(3) If vacuum is not felt on finger, clean the positive crankcase
ventilation valve and ventilation hose in cleaning solvent or
replace if necessary_

Positive Crankcase Ventilation (PCV) Valve Inspection

(1)Insertthin stick into the positive crankcase ventilation
valve from the threaded side to check that the plunger
moves

(2) If the plunger does notmove, the positivecrankcase
ventilation valve is clogged,Clean it or replace

Оригинальная страница руководства
Страница 26
100%

Назад
Сверху