1989-Mitsu-Factory Manual · Рулевое управление с усилителем · страница 33 из 40 · Открыть оригинал PDF ↗
18. REMOVAL OF FLOW CONTROL VALVE/lS. FLOW CON-
TROL SPRING
Remove the flow-control valve and the flow-control spring
from the oil pump body.
Caution
Do not disassemble the flow control valve.
Проверка
NISRGAL
l Check the flow control valve for clogging.
l Check the pulley assembly for wear or damage.
l Check the groove of rotor and vane for “Stepped” wear.
l Check the contact surface of cam ring and vanes for
“stepped” wear.
l Check the vanes for damage.

CHECK OF GAP BEIWEEN VANE AND ROTOR GROOVE
Install vane to rotor groove as illustrated. Measure the gap
between vane and rotor groove with feeler gage.
Limit: 0.06 mm (.0024 in.]



NWRliM
SERVICE POINTS OF REASSEMBLY 18. INSTALLATION OF FLOW CONTROL VALVE
(1) If the flow control valve is to be replaced, install the
flow control valve to the oil pump body corresponding
with the body identification mark (A&C,).
(2) Apply the specified fluid to the outside of the flow
control valve.
Specified fluid: Automatic transmission fluid DEX-
RON type



