1989-Mitsu-Factory Manual · Рулевое управление с усилителем · страница 37 из 40 · Открыть оригинал PDF ↗
NIORDAJ
SERVICE POINTS OF INSTALLAnON
6. INSTALLATION OF PRESSURE HOSEI7. PRESSURE
TUBE ASSEMBLY
Pressure 6. INSTALLATION OF PRESSURE HOSEI7. PRESSURE
TUBE ASSEMBLY
Align the pressure hose and pressure tube assembly paint
mark and tighten the flare nut. If there is a deviation of 2
mm (.079 in.) or more, reinstall the tube.
Presshre tube
assembly
STEERING LINKAGE
REMOVAL AND INSTALLATION


Removal steps
1. Under skid plate
2. Cotter pins
3. Slotted nuts
dte ++ 4. Tie rod ends
5. Cotter pins
6. Slotted nuts
** 7. Relay rod
8. Self-locking nuts
9. idler arm suo~ort
IO. Dust covers
13. Dust cover
14. O-ring
15. Self-locking nut
16. Washer
17. Idler arm
18. Bushings
NOTE
(1) Reverse the removal procedures to reinstall.
(2) l * : Refer to “Sewice Points of Removal.
(3) ** : Refer to “Service Points of Installation”.
(4) q : Non-reusable parts
11. Nuts
12. Pipes
