MANUALS · SUPPLEMENTAL RESTRANT SYSTEM (SRS) [52B] · страница 41 из 48 · Открыть оригинал PDF ↗
Текст распознан со скана. Числа и обозначения можно сверить с оригиналом ниже.
(3)Check for continuity between the No.1 connector of the
clock spring and connectors No.3 and



NOTE
indicates that there is continuity between the terminal:
(4)Check of resistance between the terminals
Joint theNo.2connector andNo_5 connector of
the clock spring to connector #4 and connector
3, respectively;of the SRS Check Harness
NOTE
When joining SRS Check Harness connector # 4, align
its white paint with the hollow portion of the No.2
connector of the clock spring:
Check for continuity between terminaland terminal
22,and terminal2and terminal 21 ,of SRS Check
Harness connector # 5, usingdigital multi-meter:
Standard value: less than 0.4 Q
