MANUALS · STEERING [37] · страница 25 из 52 · Открыть оригинал PDF ↗
Текст распознан со скана. Числа и обозначения можно сверить с оригиналом ниже.
8.INSTALLATION OF ADJUSTING SPACER

(1) Install the adjusting spacer to the adjusting bolt and
measure the cross-shaft axial play:
Standard value:0.05 mm (0.0020 in.) or less
(2) Ifthemeasuredvalueisnotwithinthestandard
value ,makeadjustment bychangingtheadjusting
spacer:.
INSTALLATION OF TOP COVER AND CROSS-SHAFT ASSEMBLY
Lubricate the bearings and the gear teeth of each shaft.
(1)Movetheballnutofthe mainshafttothecentre
position (straight-ahead position)
Caution
Use care not to damage the cross-shaft oil seal:
(2)Turn the adjusting boltor3 timesuntil thetooth
surfaces are in contact.

(3) Measure the mainshaft total starting torque.
Secure the flange part of the gear box housing in
a vise.
Measurethemainshafttotal starting torqueby
usingthe special tools.
Standard value:0.65-0.85 Nm
(6.5-8.5 kgcm, 5.7-7.3 in.Ibs )
NOTE
The mainshaft should rotate smoothly across the
entire range
If themeasured value is not within the standard
or
value, adjust by turningthe adjusting bolt
out
If it can not be adjusted to the standard value by
turningthe adjustingbolt;checkthe following
points
ACross-shaft eccentricity due to improperlyin-
stalled top cover
BCross-shaft needle roller bearing damaged
CEnd cover improperly installed
2INSTALLATION OF PITMANARM

Feb: 1991
Install the pitman arm to the gear box with the mating
marks aligned:
