Pajero II Workshop Manual 1991 · Электрооборудование двигателя · страница 44 из 54 · Открыть оригинал PDF ↗
Текст распознан со скана. Числа и обозначения можно сверить с оригиналом ниже.
(1)Measure the voltage at the control unit terminals_
NOTE
(1) Inspect with the control unit connector connected_
(21When measuring the voltage,connect the control unit terminal (10) to the earth:
Terminal Voltage ReferenceTable
Распознанный текст таблицы — требует сверки с оригиналом
| Control unit inspection terminal | Inspection item | Inspec | tion conditions | Standard value |
|---|---|---|---|---|
| Ignition switch | Ignition switch | "OFF "ON' | Battery voltage | |
| (IG power supply) | "ON" "OFF' | 0.5v | ||
| Ignition switch (ST power supply) | Ignition switch | "START" "OFF | More than 8V | |
| Alternator L-terminal | Ignition switch | "OFF' "ON" | 4V | |
| Idle | More than 11V | |||
| Glow plug relay | Ignition switch | "OFF "ON' | 12v After approx: seconds 0.5v | |
| Glow plug relay | Ignition switch | "OFF" "ON" | 12V After approx seconds 0.5v | |
| 13 | Engine coolant temperature sensor | Ignition switch ON" OFF | When engine coolant 20*C (-4PF) temperature | 4.3 4.5V |
| When engine coolant temperature is 0'C (32'F) | 3.7 3.9v | |||
| When engine coolant temperature is 20PC (68PF) | 2.8 3.0v | |||
| When engine coolant temperature is 40FC (104PF) | 1.9 2.1V | |||
| When engine coolant temperature is 80PC (1769F) | 0.5 0.7V |
View of harness-side connector of glow
controlunit fromterminal side (13P)
(2) Remove the controlunit connector andcheck the con-
tinuity between the harness-side connector terminals_
Распознанный текст таблицы — требует сверки с оригиналом
| Inspection terminal | Inspection item | Continuity (resistance value) | ||
|---|---|---|---|---|
| 13 | 12 10 | 10 | Glow plug constant current circuit | Continuity (approx 0.06021 |
| Earth DELO602 | 5 11 | Glow plug voltage measurement circuit | Continuity 0.0602) (approx. | |
| 10 | Glow plug relay | Continuity (approx. 30) | ||
| 10 | Glow plug relay | Continuity 30) (approx |
Feb: 1991


