1989-Mitsu-Factory Manual · fuel system · страница 41 из 53 · Открыть оригинал PDF ↗
-SLOW CUT SOLENOID VALVE OPERATION CHECK mm-
(1) Apply battery voltage directly to the slow cut solenoid
valve terminals.
(2) Check that the valve operates with a click.

SLOW CUT SOLENOID VALVE RESISTANCE MEASURE-
MENT N14MGCAb
(1) Using a circuit tester, check that there is no continuity
between the solenoid valve body and terminals.


(2) Measure resistance between the terminals.
Standard value : 48 - 6On [at 20°C (68”F)]


FEEDBACK SOLENOID VALVE OPERATION CHECK N~.IGD~~
(1) Apply battery boltage directly to the feedback solenoid
valve terminals.
(2) Check that the valve operates with a click.

(3) Check that the jet is free from clogging.



( TSB Revision
