1987 · Карбюраторная система питания — страница 34

INSPECTION OF CARBURETOR SECONDARY VALVE OPERATION N14FOM · 34

1987-Montero · Fuel System Carb a · страница 34 из 86 · Открыть оригинал PDF ↗

Иллюстрация 1, страница 34

INSPECTION OF JET AIR NIPPLE FOR CLOGGING-High alti-
tude specifications for the 49 states (excluding California)
only NlQFRCA

NOTE

For the nipple position, refer to the Appearance of Carburetor
(P.14-25).

(1) Disconnect the vacuum hoses from both air nipple and jet air
nipple and connect a hand vacuum pump to the nipples.
(2) Apply vacuum to see that it leaks and does not build up inside
carburetor.

(3) If vacuum builds up, disassemble and check the carbure-
tor. (Refer to P.14-63).

Иллюстрация 2, страница 34
Иллюстрация 3, страница 34

INSPECTION OF CARBURETOR SECONDARY VALVE OPERATION N14FOM

(1) Remove the air filter assembly.

Иллюстрация 4, страница 34
Иллюстрация 5, страница 34
Иллюстрация 6, страница 34

(3) With a vacuum of 13.3 kPa (1.9 psi) applied by the vacuum
pump, fully open the primary throttle valve and check that
the secondary throttle valve also opens fully.

Replace depression chamber
chamber (vacuum leaks)
Vacuum is held but secondary Clean secondary throttle valve
valve does not onerate and related Darts

Оригинальная страница руководства
FBC SYSTEM-Service Adjustment Procedures
100%

Назад
Сверху