1989-Mitsu-Factory Manual · Передняя подвеска · страница 29 из 66 · Открыть оригинал PDF ↗
6. Apply the multipurpose grease to both the interior of dust
cover and the upper ball joint.
7. Apply the specified sealant to the grooves in the upper
ball joint.
Specified sealant : 3M ART Part No. 8663 or equivalent
8. Secure the dust cover to the upper ball joint with a ring.
SERVICE POINTS OF INSTALLATION
N02MEp9
10. INSTALLATION OF UPPER ARM



