1987-Montero · Front susp a · страница 38 из 83 · Открыть оригинал PDF ↗

- Shlock Absorber and Upper Arm
4. Press-fit the new upper ball joint with special tools aligning
the mating mark with the upper arm center.




5. Using a snap ring pliers, fit the snap ring securely in the
groove of the joint case.
Caution
Limilt the opening of the snap ring to a minimum.


6. Apply the specified grease to both the interior of dust
cover and the upper ball joint.

Specified grease : Multipurpose grease SAE 5310, NLGI
No. 2
7. Apply the specified sealant to the grooves in the upper ball
joint.
Specified sealant : 3M ART Pat-t No. 8663, No. 8661 or
equivalent
8. Secure the dust cover to the upper ball joint with a ring.
SERVICE POINTS OF INSTALLATION NOZMEAA
10. INSTALLATION OF UPPER ARM
When the upper arm assembly is installed to the cross-
member, insert the upper arm shaft attaching bolts from
outside the crossmember and put adjusting shims be-
tween the crossmember and upper arm shaft.


. ADJUSTMENT OF CLEARANCE BETWEEN BUMP STOP-
PER TO BUMP STOPPER BRACKET
Refer to P.2-49.



